Excavation cost at a glance
- Typical range: $1,700 – $3,800
- Most homeowners pay: around $3,200
Cross-checked against five published sources for this project. Sources used for this page: Angi, '2026 Excavation Cost: A Complete Price Guide', updated Sep 14, 2026 (national average $3,979, based on 3,439 verified projects; most homeowners pay $1,659-$6,715; low $800, high $14,500; by project: basement $5,000-$15,000, patio/driveway $1,000-$2,500, new construction $1,500-$10,000, pool $400-$1,500, land clearing $1,400-$5,800, plumbing $1,500-$10,000, landscaping $500-$6,000, rock/ledge $1,000-$20,000, hillside $1,000-$5,000; factors: size/access $1,500-$5,000, soil +$200-$1,200, leveling $1-$12 per cubic yard, surveys+permits $50-$550, soil testing/cleanup $700-$2,200, hauling $8-$25 per cubic yard, labour $120-$150 per hour or $50-$200 per cubic yard, equipment rental $100-$250 per hour, grading/leveling $400-$6,500; surveys+permits+testing $750-$2,750 in the lede; blasting $40-$100 per cubic yard, boulders $50-$250; new-construction basement $1,500-$6,000, up to $10,000+), HomeGuide, 'How Much Does Excavation Cost? (2026)', dated Feb 5, 2026 ($2.50-$15.00 per cubic yard; average $1,100-$5,600; national average $3,500; minimum $500, maximum $20,000; operator $100-$300 per hour, operator only $50-$150 per hour, mini excavator rental $200-$700 per day; minimum project fees $500-$800; soil table: light $2.50-$6.00, average $6.00-$10.00, heavy/wet or loose rock $10.00-$15.00, jackhammered rock $50-$200+ per cubic yard; rock offsite $220-$250 per cubic yard; cut and fill $1-$15 per cubic yard; projects: home site $1,500-$10,000, basement new construction $10,000-$30,000, dig around existing house $5,000-$15,000 or $100-$250 per linear foot, pool $1,500-$5,000, driveway/patio/deck pad $1,000-$2,500, hillside $1,000-$5,000, yard $500-$5,000, trenching $5-$12 per linear foot, French drain $10-$25 per linear foot, pond $300-$3,200; dirt removal $140-$230 per cubic yard, $1,400-$2,300 per truckload; fill dirt $5-$25 per cubic yard; survey $200-$1,200; permit $50-$400; soil testing $25-$200 per sample for heavy metals, $5-$50 for a single contaminant; land clearing $1,200-$8,000 per acre; grading $500-$5,000; time 1-3 days small, 3+ weeks large/rocky; call 811 before digging) and Thumbtack, '2026 Excavation Cost', published Jul 1, 2026 (national average range $1,081-$3,799, most people pay around $2,020, low $438, high $9,919, from Thumbtack pro data; topsoil excavation $60 per hour, Hartloff Property Restoration, Olympia WA, mini-excavator backhoe tractor). Corroboration, labelled and never the headline: Fixr reslope guide (soil excavation $50-$200 per cubic yard; dirt removal $130-$200 per cubic yard), This Old House (exterior excavation $50-$200 per cubic yard, via 2026 basement waterproofing guides) and CivilMath (excavation $50-$200 per cubic yard all-in, most ordinary jobs $70-$120). INDEPENDENCE: Angi and HomeGuide sit in the same Angi Inc. data family and count as one confirmation, not two; the three independent confirmations are the Angi family, Thumbtack (own pro data) and Fixr (own cost data, corroborating the per-yard band). Synthesized typical = honest overlap of the three most/average-range bands (Angi $1,659-$6,715; HomeGuide $1,100-$5,600; Thumbtack $1,081-$3,799) = $1,659-$3,799, rounded to $1,700-$3,800; most-pay $3,200 = mean of the three published national averages ($3,979 Angi; $3,500 HomeGuide; $2,020 Thumbtack — mean $3,166, rounded), labelled as such — no source publishes a single national average all three agree on. PER-CUBIC-YARD DISAGREEMENT, published not averaged away: HomeGuide prices digging at $2.50-$15.00 per cubic yard (its table says including labour and equipment), while Angi ($50-$200 per cubic yard labour), Fixr ($50-$200 soil excavation), This Old House ($50-$200 exterior excavation) and CivilMath ($50-$200 all-in, $70-$120 typical) publish $50-$200 — the guides do not price the same scope under the same label, so no single per-yard figure is published as settled. Hauling disagreement also published: Angi $8-$25 per cubic yard against HomeGuide $140-$230 per cubic yard to move dirt ($1,400-$2,300 per truckload) and Fixr $130-$200 per cubic yard dirt removal. No source publishes percentage shares for excavation, so the breakdown carries dollar lines only and there is no share bar, no estimator's note and no worked example on this page. Checked November 2026.. Sources last checked: October 2026 — This Old House, HomeGuide, Fixr, Angi, Thumbtack. How we calculate these costs
Cost by scope

| Scope | Typical cost | What it includes |
|---|---|---|
| Small job — driveway or patio pad, trenching, yard work | $500 – $2,500 | The cheap end: Angi prices grading a patio or driveway pad at $1,000–$2,500 and HomeGuide matches it exactly, while HomeGuide prices trenching for sewer, septic or drainage at $500–$1,200 and yard excavation at $500–$5,000. Thumbtack's low end is $438 — a shallow dig on open ground with a small machine is this tier |
| Standard residential excavation — most common | $1,700 – $3,800 | The shared band itself: Angi's most-pay band ($1,659–$6,715), HomeGuide's average range ($1,100–$5,600) and Thumbtack's average range ($1,081–$3,799) all overlap here — digging for a new home site, a foundation pad or a pool on ordinary soil, the common residential job and the band this page is built on |
| Basement, large home site or rock — the expensive end | $5,000 – $15,000+ | The expensive end: Angi prices a basement dig at $5,000–$15,000 and HomeGuide prices digging around an existing house the same, while a new-construction basement runs $10,000–$30,000 in HomeGuide and $30,000–$50,000+ in difficult or rocky soil. Rock or ledge removal runs $1,000–$20,000+ in both guides, so a dig that hits rock is priced as a different job, not a bigger version of the standard one |
Where the money goes
| Part of the job | Share | Note |
|---|---|---|
| Machine time + operator (excavator, backhoe, dozer) | No published share | $100–$300 per hour for an operator with their own mini excavator, backhoe or skid-steer loader (HomeGuide); Angi prices labour at $120–$150 per hour, and an operator without equipment at $50–$150 per hour in HomeGuide. Renting your own mini excavator runs $200–$700 per day in HomeGuide, $100–$250 per hour with an operator in Angi — the machine, not the dirt, is usually the biggest line, which is why depth and access move the total most. |
| Digging by the cubic yard | No published share | HomeGuide prices digging at $2.50–$15.00 per cubic yard by soil type — light soil $2.50–$6.00, average soil $6.00–$10.00, heavy or wet soil or loose rock $10.00–$15.00 — while Angi, Fixr, This Old House and CivilMath publish $50–$200 per cubic yard for the excavation job (CivilMath's typical all-in band is $70–$120). The guides disagree and do not price the same scope under the same label, so both bands are published — ask for the per-yard rate in writing with what it includes. |
| Dirt removal / hauling off site | No published share | Angi prices hauling excavated dirt away at $8–$25 per cubic yard, while HomeGuide prices moving dirt at $140–$230 per cubic yard, or $1,400–$2,300 per dump-truck load, and Fixr prices dirt removal at $130–$200 per cubic yard. The three guides do not price the same haul — distance, truck size and tipping fees decide it — so compare quotes on the haul distance and whether tipping is inside the number, not on the headline rate. |
| Rock / ledge removal | No published share | Jackhammered rock runs $50–$200+ per cubic yard in HomeGuide, or $220–$250 per cubic yard if the rock is hauled off site; Angi prices blasting at $40–$100 per cubic yard and removing large boulders at $50–$250. Excavation costs can jump to $15,000–$20,000+ if the dig hits rock when digging a foundation, basement or pool (HomeGuide) — confirm the contract states the extra cost if rock is found, before the bucket hits it. |
| Survey, permits + soil testing | No published share | An excavation permit runs $50–$400 in both Angi and HomeGuide; a land survey runs $400–$550 in Angi and $200–$1,200 in HomeGuide. Soil testing runs $700–$2,200 in Angi, or $25–$200 per sample for heavy metals in HomeGuide. Angi budgets surveys, permits and soil testing together at $750–$2,750 before excavation begins — and every guide says to call 811 to mark underground utility lines before any digging starts. |
| Cut and fill + backfill dirt | No published share | Residential cut and fill runs $1–$15 per cubic yard in HomeGuide — cutting dirt from the high spots and using it to build up the low ones for levelling. Fill dirt brought in runs $5–$25 per cubic yard in HomeGuide and $5–$30 in Angi. A balanced cut-and-fill job buys little fill at all; a job that needs dirt hauled in pays for the fill plus the haul, which is why the dirt plan belongs in the quote. |
| Site prep before digging | No published share | Land clearing runs $1,150–$3,700 in HomeGuide's excavation table (Angi prices it at $1,400–$5,800 as a project type), and grading runs $500–$5,000. Clearing and grading are separate jobs with their own prices on the land clearing and yard grading guides — trees, stumps and boulders come out before the dig can begin, and the pad is graded after it. |
| Equipment rental (DIY, small jobs only) | No published share | $200–$700 per day for a mini excavator rental in HomeGuide, $100–$250 per hour with an operator in Angi. HomeGuide puts a small project at 1 to 3 days and a larger or rocky one at 3+ weeks — DIY only fits a small, shallow dig on open ground; Angi is explicit that excavation is not a DIY job at scale, because the machines are specialised and a wrong dig can collapse soil or damage a foundation. |

What moves the price most
Soil type is the first driver: loose sand and light soil dig fast and cheap — HomeGuide prices light soil at $2.50–$6.00 per cubic yard — while compacted clay and rock add $200–$1,200 to the job in Angi and push the per-yard rate to $50–$200+ where a jackhammer or blasting is needed. Size and depth are the second: a shallow patio pad and a full basement are different jobs in every guide — Angi prices a patio or driveway pad at $1,000–$2,500 against a basement at $5,000–$15,000, and HomeGuide's basement table runs $10,000–$20,000 for an 8 to 9 foot dig against $20,000–$30,000 for 10 to 12 feet. Access is third: Angi prices size and accessibility at $1,500–$5,000, and a fenced yard that only a mini excavator can enter, or a site a dump truck cannot reach, pays more per yard for the same hole. The dirt plan is fourth: spoil stockpiled on site costs nothing to move, while hauling it away runs $8–$25 per cubic yard in Angi against $140–$230 in HomeGuide — the guides disagree on the haul, so get the distance and the tipping fee in writing. Rock is fifth: a dig that hits a ledge stops being a digging job and becomes a breaking job, at $50–$200+ per cubic yard in HomeGuide and up to $15,000–$20,000+ added to a foundation or pool dig. Permits, survey and 811 are sixth: permits $50–$400 and a survey $200–$1,200, and every guide says to call 811 to mark underground lines before the bucket goes in. What excavation does NOT include: the concrete that goes in the hole — HomeGuide prices a slab at $12,000–$28,000 and an unfinished basement foundation at $70,000–$100,000 — land clearing, grading and drainage, which are priced on their own guides. DIY fits only small shallow digs: a rented mini excavator at $200–$700 a day (HomeGuide) for a small open-ground job; larger digs need a licensed operator, because soil collapses and foundation damage are the failure modes Angi names. Methodology: figures cross-checked across Angi (updated Sep 14, 2026), HomeGuide (dated Feb 5, 2026) and Thumbtack (published Jul 1, 2026), read in full on 2026-11-16. Angi and HomeGuide sit in the same Angi Inc. data family and count as one confirmation; the three independent confirmations are the Angi family, Thumbtack (own pro data) and Fixr (own cost data, corroborating the per-yard band). The per-cubic-yard disagreement (HomeGuide $2.50–$15.00 against $50–$200 in Angi, Fixr, This Old House and CivilMath) and the hauling disagreement (Angi $8–$25 against HomeGuide $140–$230 per cubic yard) are published as disagreements, not averaged away. Related costs: land clearing, yard grading, foundation installation, French drain installation, pool installation, concrete driveway, septic system installation and Remodel Cost Index.
Costs in your city
Labor is the biggest variable in any remodel, and labor is local — the same bathroom can price very differently in Houston than in Boston. We are adding city editions metro by metro, each with its own labor index, permit notes and climate factors, written for that city rather than copied from this page. Wave 1: Houston, Dallas–Fort Worth, Phoenix, Atlanta, Miami–South Florida, Orlando, Tampa, Charlotte, Austin and San Antonio. Until your city's page is live, use the national range here and weight it the way contractors do: Sun Belt labor often prices near or below the national middle, while coastal California and the Northeast metros often price well above it.

Frequently asked questions
How much does excavation cost?
Most standard residential jobs land in the $1,700–$3,800 band on this page, with a common middle around $3,200 — the mean of the three published national averages (Angi $3,979, HomeGuide $3,500, Thumbtack about $2,020). A small driveway pad or trench can come in below that band, and a basement dig or a job that hits rock usually lands above it.
How much does excavation cost per cubic yard?
The guides disagree, and the page prints both bands. HomeGuide prices digging at $2.50–$15.00 per cubic yard by soil type — light soil $2.50–$6.00, average soil $6.00–$10.00, heavy or wet soil $10.00–$15.00 — while Angi, Fixr, This Old House and CivilMath publish $50–$200 per cubic yard (CivilMath's typical all-in band is $70–$120). The guides do not price the same scope under the same label, so ask for the per-yard rate in writing with what it includes — machine, operator, loading and haulage, or digging alone.
How much does it cost to excavate for a basement?
Angi prices digging for an existing basement at $5,000–$15,000, and HomeGuide prices digging around an existing house the same. A new-construction basement runs $10,000–$30,000 in HomeGuide — $10,000–$20,000 for an 8 to 9 foot dig, $20,000–$30,000 for 10 to 12 feet — and $30,000–$50,000+ in difficult or rocky soil. The concrete foundation itself is a separate cost, priced on the foundation installation guide.
How long does excavation take?
HomeGuide puts a small project at 1 to 3 days and a larger one at up to 3+ weeks, with rocky soil, a rock shelf or large boulders stretching the schedule most. Depth, access and haul distance matter more than the size of the hole — a tight backyard that only a mini excavator can enter takes longer per yard than an open lot.
Do I need a permit to excavate, and should I call 811?
Yes to both. An excavation permit runs $50–$400 in both Angi and HomeGuide, varying by city and scope, and most cities require one for any earthmoving project. Call 811, the national “Call before you dig” number, to have underground utility lines and pipes marked before any digging starts — hitting a buried line is the accident every guide warns about.
Is excavation different from land clearing or grading?
Yes — excavation digs the hole, priced by the cubic yard and by project. Land clearing removes the vegetation first and is priced per acre, while grading reshapes the bare ground's slope and level after the dig, priced per square foot. A new home site usually needs all three in sequence: clearing, then excavation, then grading — and each is priced on its own guide.