How Much Does a Modular Home Construction Cost? (2026)

By Ahsan ul Haq · Last updated: 11 November 2026 · Planning estimate — not a quote · How we estimate

Typical range
$160,000 – $320,000
Most homeowners pay around $240,000 · A modular home, factory-built and finished on site — Angi's 2026 national average is $240,000, with most homeowners paying $160,000–$320,000. That is the price for a 2,000 sq ft standard home at about $120 per sq ft ($80–$160 per sq ft installed), on land you already own — land is $10,000–$200,000+ extra and is never included in these figures. Modular homes are built to the same local and state building codes as site-built homes and set on a permanent foundation; they are not manufactured (mobile) homes, which follow federal HUD code on a steel chassis.
typical
$160,000$320,000
Low end = minor scope  ·  marker = typical middle  ·  high end = major scope. Add 10–20% contingency to any budget.
Colourful modular apartment buildings in Almere

Modular Home Construction cost at a glance

  • Typical range: $160,000 – $320,000
  • Most homeowners pay: around $240,000
  • Per square foot: $120 per sq ft

Cross-checked against two published sources for this project. Sources used for this page: Angi, 'How Much Does a Modular Home Cost? [2026 Data]', updated Oct 29, 2026 — national average $240,000; most homeowners pay $160,000–$320,000; $80–$160 per sq ft installed; by size (1,500 sq ft $120,000–$240,000; 2,000 sq ft $160,000–$320,000); land $10,000–$200,000+ extra, excluded from the average; customizations add 20–100%, up to $900,000; delivery $5–$10 per sq ft, $3,000–$20,000; foundation by type (basement $20–$37, crawl space $6–$18, pier and beam $6–$12, slab $5–$16 per sq ft); permits $500–$4,000, averaging $1,000; timeline 4–6 months, up to ~8 with delays; stick-built average $323,000 vs modular $240,000. HomeGuide, 'How Much Does It Cost to Build a Modular Home? (2026)', updated Dec 1, 2025 — 1,500 sq ft base unit $75,000–$150,000 ($50–$100 per sq ft), turn-key total $120,000–$240,000; standard total $80–$160 per sq ft; estimator table (unit, land prep $4,000–$11,000, foundation $6,000–$20,000, delivery $3,000–$12,000, taxes $5,000–$15,000, installation $10,000–$50,000, utilities $2,500–$25,000+, permits $500–$4,000); crawl space $6,300–$16,300; states a modular home CANNOT be placed on a monolithic slab; custom $200,000–$500,000 all-in; timeline 2–6 months; modular 10–20% cheaper than stick-built. NOTE: Angi and HomeGuide sit in the same Angi Inc. data family — they are NOT two independent confirmations of the $240,000 average; only Angi publishes that average. Rocket Mortgage, 'Modular home prices: What to expect when buying', updated Mar 15, 2026 — permits $500–$5,000; foundation $7–$30 per sq ft; utility connections up to $6,700 itemized (gas $550, sewer $3,200, water $1,600, electric $1,350); customizations +$10–$150 per sq ft; delivery and assembly $5–$35 per sq ft; sales tax $5,000–$10,000; land not included. Realtor.com, 'Modular vs. Manufactured Homes: Which Is Cheaper and Easier To Find?', Oct 26, 2026 — modular homes 'usually around $110 per square foot' vs manufactured around $85; corroboration of the $/sq ft band only. Disagreements published, not averaged: Angi's non-cost-guide article says a $270,000 average — not used; slab (Angi lists it, HomeGuide says no monolithic slab); GC share (Angi 20–40% — not used, its own task list sums far below); custom top end $600,000+ vs Angi's $900,000 extreme. Land is excluded from every headline figure on this page. Breakdown shares are derived from the worked example below. Checked November 2026.. Sources last checked: October 2026 — HomeGuide, Angi. How we calculate these costs

Cost by scope

Modular Home Construction cost ranges by scope — chart of the table below
ScopeTypical costWhat it includes
Budget — 1,200–1,500 sq ft basic single-story$120,000A basic single-story home on a standard floor plan, pier-and-beam or crawl-space foundation, standard finishes and minimal site work — no garage or deck. About $80–$100 per sq ft, grounded in HomeGuide's 1,500 sq ft turn-key low end of $120,000.
Standard — 2,000 sq ft 3-bed/2-bath$240,000The most-pay tier — the worked example below: a 2,000 sq ft 3-bed/2-bath home on a crawl-space foundation, standard finishes, full button-up finishing, utility hookups, permits and sales tax. About $120 per sq ft.
Premium — 2,000–2,500 sq ft custom design$450,000A custom design with a basement foundation, upgraded finishes (quartz, hardwood, custom cabinetry), plus a garage and deck. About $180–$225 per sq ft, inside HomeGuide's custom $130–$310 per sq ft band. Custom builds can reach $600,000+; Angi's $900,000 figure is an extreme, not a typical premium.

Where the money goes

Part of the jobShareNote
Factory modules52% of total$125,000 for the factory modules (base unit) — 2,000 sq ft at $62.50 per sq ft, inside HomeGuide's $50–$100 per sq ft base band ($100,000–$200,000 for 2,000 sq ft). Share derived from the worked example below.
Installation and button-up finishing20% of total$48,000 for installation and button-up finishing — inside HomeGuide's $10,000–$50,000 installation band and Rocket Mortgage's $5–$35 per sq ft delivery-plus-assembly band ($10,000–$70,000 for 2,000 sq ft). Share derived from the worked example below.
Utility hookups9% of total$21,000 for utility hookups (water, sewer, electric, gas) — inside HomeGuide's $2,500–$25,000+ utilities band. Share derived from the worked example below.
Foundation — crawl space6% of total$14,000 for a crawl-space foundation — inside HomeGuide's $6,300–$16,300 crawl-space band and Angi's $6–$18 per sq ft crawl-space band. Share derived from the worked example below.
Delivery and crane set5% of total$12,000 for delivery and crane set — inside HomeGuide's $3,000–$12,000 and Angi's $3,000–$20,000 delivery bands (Angi: $5–$10 per sq ft). Share derived from the worked example below.
Sales tax4% of total$10,000 for sales tax — inside HomeGuide's $5,000–$15,000 and Rocket Mortgage's $5,000–$10,000 sales-tax bands. Share derived from the worked example below.
Site prep — clearing and grading3% of total$7,500 for site prep (clearing and grading) — inside HomeGuide's $4,000–$11,000 land-prep band and Angi's clearing $1,400–$6,200 plus grading $1,000–$3,300 combined band. Share derived from the worked example below.
Permits and fees1% of total$2,500 for permits and fees — inside Angi's $500–$4,000, HomeGuide's $500–$4,000 and Rocket Mortgage's $500–$5,000 permit bands. Share derived from the worked example below.
Factory modules · 52%Installation and button-up finishing · 20%Utility hookups · 9%Foundation — crawl space · 6%Delivery and crane set · 5%Sales tax · 4%Site prep — clearing and grading · 3%Permits and fees · 1%
Estimator’s note: on a modular home construction, factory modules is usually where quotes swing most (52% of total of a typical budget). Ask every contractor to itemize that line in writing — totals are only comparable when that part is.
Stacked modular units on a site: delivery and crane set run $3,000–$20,000 (Angi), priced at $12,000 (5%) in the worked example.
Stacked modular units on a site: delivery and crane set run $3,000–$20,000 (Angi), priced at $12,000 (5%) in the worked example.

What moves the price most

Worked example — $240,000 most-pay home (2,000 sq ft standard 3-bed/2-bath, crawl-space foundation, on land already owned, standard finishes): factory modules $125,000 (52%) + installation and button-up finishing $48,000 (20%) + utility hookups $21,000 (9%) + foundation $14,000 (6%) + delivery and crane set $12,000 (5%) + sales tax $10,000 (4%) + site prep $7,500 (3%) + permits and fees $2,500 (1%) = $240,000. Every line sits inside its published band. Land is excluded — add $10,000–$200,000+ for land (Angi); garage, deck, driveway and landscaping are extra too. Delivery and sales tax: HomeGuide notes both are often included in the factory unit price — this example assumes them billed separately (a factory quote), so do not treat this split as the only way builders quote. Where sources disagree: the average — Angi's dedicated cost guide says $240,000 (updated October 2026), while a different Angi article says $270,000; this page uses $240,000. Slab foundations — Angi lists slab at $5–$16 per sq ft, while HomeGuide says a modular home cannot sit on a monolithic slab because it needs under-floor space for connections. General-contractor cost — Angi says 20–40% of total ($48,000–$96,000), but its own task list sums far below that and HomeGuide's estimator has no separate GC line, so no GC percentage is published here; GC coordination sits inside the installation line. Timeline: 2–6 months total (HomeGuide), on-site set-up 4–6 weeks; Angi says 4–6 months, up to about 8 with permitting or manufacturing delays. Cheaper than site-built: 10–20% less (HomeGuide); Angi puts the average stick-built home at $323,000 vs $240,000 modular. Related costs: tiny house construction, detached garage construction, pole barn construction and home addition.

Work out your quantities: before you compare quotes, run your measurements through our free remodeling calculators (paint, tile, concrete and flooring) — each one shows its formula and runs entirely in your browser.

Costs in your city

Labor is the biggest variable in any remodel, and labor is local — the same bathroom can price very differently in Houston than in Boston. We are adding city editions metro by metro, each with its own labor index, permit notes and climate factors, written for that city rather than copied from this page. Wave 1: Houston, Dallas–Fort Worth, Phoenix, Atlanta, Miami–South Florida, Orlando, Tampa, Charlotte, Austin and San Antonio. Until your city's page is live, use the national range here and weight it the way contractors do: Sun Belt labor often prices near or below the national middle, while coastal California and the Northeast metros often price well above it.

How this estimate was built: the range on this page is a synthesis of at least three published industry sources (national cost guides and the Remodeling Magazine Cost vs. Value data among them), cross-checked in October 2026. We publish planning ranges, never a single pretend-precise price. Full method: How We Estimate Costs.
A row of white modular cabins: a standard 2,000 sq ft modular home runs $160,000–$320,000 (Angi) before land — $10,000–$200,000+ extra.
A row of white modular cabins: a standard 2,000 sq ft modular home runs $160,000–$320,000 (Angi) before land — $10,000–$200,000+ extra.

Frequently asked questions

How much does a modular home cost?

Most homeowners pay $160,000–$320,000, with Angi's 2026 national average at $240,000. Installed cost runs $80–$160 per sq ft (Angi and HomeGuide agree). Land is not included — add $10,000–$200,000+ (Angi).

Is a modular home the same as a manufactured (mobile) home?

No. A modular home is built to the same local and state building codes as a site-built home and set on a permanent foundation. A manufactured home is built to federal HUD code on a steel chassis. Modular homes qualify for traditional mortgages (conventional, FHA, VA, USDA) once on a permanent foundation; manufactured homes often do not.

Does the price include land?

No — the $240,000 average excludes land entirely (Angi). Land adds $10,000–$200,000+ depending on plot size, condition and location. A garage ($19,600–$28,200), deck ($4,000–$10,000), driveway and landscaping are also extra (HomeGuide).

How long does it take to build a modular home?

2–6 months total (HomeGuide), with on-site set-up taking 4–6 weeks; the factory builds 80–90% of the home off-site. Angi says 4–6 months, up to about 8 months with permitting or manufacturing delays. A comparable site-built home takes 6–12 months.

Can you get a mortgage for a modular home?

Yes — modular homes qualify for conventional, FHA, VA and USDA loans once set on a permanent foundation (Rocket Mortgage; Realtor.com). Down payments are typically higher than the 20% standard for site-built homes (HomeGuide).

Can a modular home go on a slab foundation?

The sources disagree: Angi lists slab at $5–$16 per sq ft as a valid option, while HomeGuide states a modular home cannot be placed on a monolithic slab because it needs space under the floor for HVAC, electrical and plumbing connections. Check with your manufacturer and local code before choosing.

Before you sign: get at least 3 written local quotes for the same written scope, confirm permits and who pulls them, and keep a 10–20% contingency separate from the contract price.

Ahsan ul Haq — Editor, Remodel Cost Hub

Ahsan compiles and edits the cost guides on Remodel Cost Hub, cross-checking every range against at least three published sources before it is published — the full method is on our Methodology page. Spot an error on this page? Send a correction.

Modular Home Construction cost range graphic
Save this range for later: Pin it on Pinterest

Related cost guides

Dark-grey corrugated shipping container house on a hillside with a roof deck

Shipping Container Home Construction Cost

$25,000 – $250,000

A shipping container home, factory-cut and finished on site — Angi's 2026 national average is $80,000, with most homeowners paying $25,000–$250,000. That is the price for the finished home at $150–$350 per sq ft, on land you already own — land is $5,000–$18,000 per acre extra (HomeGuide) and is never included in these figures. The container itself is only a small share of the finished cost; site work, foundation, cutting and welding, insulation and finishes dominate. Angi's text writes the $25,000–$250,000 band as 'per square foot' — a typo; it is a total.

Single-storey stone bungalow with a red tile roof and glass front, set in a large lawn

Guest House Construction Cost

$62,000 – $225,000

A detached guest house, stick-built in your backyard — Angi's 2026 national average is $85,000, with most homeowners paying $62,000–$225,000. That is the price for a guest house at $110–$250 per sq ft, on land you already own — no source includes land purchase, and site prep, utility runs and permits are priced separately below. A simple sleeping unit with a kitchenette sits in this band; a full independent dwelling with a full kitchen and full bath is a detached ADU, priced higher at $110,000–$285,000 (Angi).

A small wood-clad cabin with a metal roof behind flowering garden shrubs, rocks and grass under a blue sky

Backyard Office Construction Cost

$15,000 – $40,000

Backyard office construction typically costs $15,000 – $40,000 for a standard finished office of about 120–200 square feet, with about $25,000 the figure most jobs land near — $25,000 is the shared midpoint of the published bands (HomeGuide's $10,000–$40,000 band midpoints at $25,000, Tri-Cities' mid-range $15,000–$35,000 midpoints at $25,000, and Rivolty's entry tier starts at $25,000), not a published average itself. That works out to $120 – $250 per sq ft fully finished (Tri-Cities), against HomeGuide's $35–$75 per sq ft for a standard finish and $75–$150 for a full finish — the HomeGuide rates are structure and finish rates, not all-in project rates, and are published as such. A basic DIY shell finish can cost as little as $5,000, while a large custom site-built office runs $40,000–$75,000 and up. Rivolty's $65,000–$100,000+ premium band is a Bay Area figure (labour there runs 20–30% above the national average) and is published as such, not merged into the national typical. A guest house or ADU — plumbing, a kitchen and a bath — is a different, larger scope at $50,000–$150,000 in HomeGuide, and is published as the line this page stops at, not merged.

Log cabin with a stone foundation and covered porch, set among tall evergreens

Log Cabin Construction Cost

$50,000 – $150,000

A finished log cabin, built on land you already own — Angi's 2026 national average is $75,000 for a 500 sq ft cabin, with most homeowners paying $50,000–$150,000 at $125–$175 per sq ft. Land is not included in any figure on this page (Angi's national average is $3,160 per acre), and a kit price is not a finished price: the kit is materials only, and a turnkey build runs about 3–3.5x the kit price (Lazarus Log Homes).

A large red barn-style building with a grey metal gambrel roof and white trim, standing in a grassy field

Barndominium Construction Cost

$112,800 – $504,000

$230,000 is Angi's published national average (updated Oct 29, 2026) — NOT a derived midpoint. A finished, move-in-ready barndominium runs $65–$160 per sq ft (HomeGuide, updated Jan 16, 2026); a 2,000 sq ft home runs $130,000–$320,000. Those are BUILD costs — land is excluded. The steel kit alone is $20–$35 per sq ft in materials and is only 15–25% of the all-in cost; a kit is not a house. All-in including land and utilities, most finished builds run $180,000–$480,000 (BarndoCosts).

Finished blue-and-gray corrugated metal warehouse with a large blue overhead door and a smaller personnel door

Metal Building Installation Cost

$24,000 – $60,000

Installed shell for a 30x40 building — kit, delivery, erection and a standard concrete slab — $25 – $43 per sq ft. $41,000 is a DERIVED midpoint, NOT a published average: no source publishes a single national-average total for an installed metal building shell. It is 1,200 sq ft at $34 per sq ft ($40,800, rounded to $41,000), the midpoint of the $25–$43 per sq ft overlap band (HomeGuide, BuildingsGuide, Terrapin).